📄 Digital book in PDF · read it on your phone or print it
AC and DC coupling, sizing in kWh, where the unit can go, protection and earthing, DC isolation, G98 and G99, commissioning and handover. Every topic has its own page: the drawing first, then what you need to remember. 64 illustrated pages.
🔒 Secure checkout · PDF by email · 30-day guarantee
Every page has one big drawing and a box with the rules and steps you need to know:








Swipe to see more →
These are real pages from the book. The table of contents is the full one: 8 parts and 60 topics.
You're standing in a customer's hallway. They want the battery under the stairs, or up in the loft, and they're waiting for your answer.
You've read about siting. But the guidance gives it to you in long paragraphs, the manufacturer's manual says something else and the forums say a third thing. On site, none of it comes back in the right order.

In this book, where the unit can go is one page: the house drawn in section, outdoors where practicable, and indoors only with REI 30 separation and fire-stopped penetrations, with the places to avoid marked on the drawing.
Every other part of the job works the same way. The attached garage, the single-line diagram, DC isolation, G98 or G99, the commissioning order: each one on its own page.
You look at the page, you understand why, and you give the customer a straight answer without going back to the manual.

How a home battery works, survey and sizing, siting and fire safety, protection and earthing, isolation and labelling, notification, commissioning and handover, and revision checklists: 64 pages, all illustrated.
Think of it this way:
You're back on a call-back. The inverter is switched off and you need to work on the battery side. Is it dead, or does it only look dead?
You open the page on why a battery is never 'off' and the answer is drawn: AC off, DC still live, with the isolation points for the battery DC, the inverter AC and any PV input marked on the unit.

The same goes for the site survey walk-round, the single-line diagram, G98 or G99, and the commissioning order: each one on its own page, drawn the way you'll see it on the job.
Battery Storage Installation Illustrated is 8 parts and 60 topics, all drawn, and at the end the site checklists, an isolation card and a blank test and handover record.
What you see drawn, you don't have to memorize.
The eight install steps, what's inside the box, AC- and DC-coupled side by side, kW vs kWh and usable capacity: you explain to the customer what they're buying without mixing up power and energy.
The site survey, the supply and earthing system, whether the existing installation is fit to connect to, daily use in kWh, sizing for solar and tariffs, inverter power and backup options.
Where the unit can and can't go, the attached garage, heat detection, fixing, clearances and ventilation, outdoor installs and access.
The single-line diagram, the dedicated AC circuit, bidirectional devices, RCD type, DC cable and overcurrent, earthing on-grid and in island mode, surge protection.
Why a battery is never 'off', AC and DC isolation step by step, isolating with PV connected, locking off and dual-supply labels: you know which side is still live before you touch it.
G98 or G99, the 28-day notification, export limitation, Building Regulations notification, certificates and battery records, schemes and warranties.
The commissioning order on one page, visual inspection, dead and live tests, inverter setup, functional tests, handover and the handover pack.
The eight steps on one page, survey and siting checklists, the isolation card, the most frequent mistakes, course vocabulary and a blank test record.
At the end of the book: Site checklists, an isolation card and a blank test and handover record.

Test yourself on sizing, siting, isolation and commissioning with exam-style questions, each answer explained with the page it comes from.

The most common battery installation mistakes drawn side by side with the right way, so you can spot them on site at a glance.
📄 This is a digital PDF book sent to your email: nothing is printed or shipped.
PDF by email: We email you Battery Storage Installation Illustrated as a PDF, together with the two free books. It's a single payment: no installments, no extra charges.
Each topic of the course on one page, drawn, so you study at night or in the van and the order stays with you.
The eight steps, the isolation card and the commissioning order on single pages to revise the week before, plus the practice questions to test yourself.
A print-out to keep in the van: where the unit can go, how to prove the DC side is dead and what to send the network operator.
📄 This is a digital PDF book sent to your email: nothing is printed or shipped.
Try Battery Storage Installation Illustrated for 30 days, bonus books included.
We refund everything if the file won't open, if the book isn't what you see here, if you were charged twice or if the email doesn't arrive. Just email us.
You pay once. No subscriptions.
Yes. It doesn't teach you how to wire a consumer unit: it draws what's new with batteries, on top of what you already know, from the survey to the handover.
From BS 7671:2018 with Amendment 3 (2024), which added the chapter on stationary batteries, PAS 63100:2024 on siting and fire, the IET Code of Practice for Electrical Energy Storage Systems, ENA G98, G99 and G100, and MCS MIS 3012. It's UK-only: UK terms, units and notification rules, nothing American. The Building Regulations pages follow England and Wales; in Scotland and Northern Ireland, check your local route. Everything is explained with our own drawings, not copied from the standards.
No. It's an independent illustrated study book. It isn't published, approved or endorsed by any standards body, network operator, scheme or awarding body, and it doesn't give you a certificate, a qualification or CPD hours: those come from your accredited course.
No. It doesn't replace accredited training, the manufacturer's instructions or BS 7671 itself. It helps you understand and revise what you learn there.
No. They're written for this book, in exam style, and each answer is explained with the page it comes from.
The book and the 2 free books arrive as PDFs by email, at the address you enter when you pay.
No. It's a one-off payment. No subscription.
Yes. It's a PDF you can print at home or at a print shop, whole or just the pages you want in the van.
You have 30 days. We refund everything if the file won't open, if the book isn't what you see on this page, if you were charged twice or if the email doesn't arrive: just email us.
No more rereading the guidance and keeping nothing.
DC isolation: you see it drawn, step by step, and that's it.
You arrive at the course and the job knowing where everything is.
Drawings make studying faster.
The book is right below.
One-time payment: US$ 27 · Guarantee: 30 days · PDF by email
YES, I WANT BATTERY STORAGE INSTALLATION ILLUSTRATED FOR US$ 27📄 This is a digital PDF book sent to your email: nothing is printed or shipped.