Launch offer — valid today only

📄 Digital book in PDF · read it on your phone or print it

Home Battery Storage and BS 7671, Illustrated One Install Step on Every Page

AC and DC coupling, sizing in kWh, where the unit can go, protection and earthing, DC isolation, G98 and G99, commissioning and handover. Every topic has its own page: the drawing first, then what you need to remember. 64 illustrated pages.

GET THE ILLUSTRATED BOOK

🔒 Secure checkout · PDF by email · 30-day guarantee

Every topic, its own pageEach install step drawn, with the explanation right beside it
64 illustrated pages8 parts, from how a home battery works to the site checklists
Up-to-date sourcesChecked against BS 7671 Amendment 3 (2024), PAS 63100:2024 and the IET Code of Practice
PDF by emailFormat

Look Inside the Book

Every page has one big drawing and a box with the rules and steps you need to know:

Survey → size → site → protect → isolate → notify → commission → hand over, to BS 7671:2018+A4:2026
Survey → size → site → protect → isolate → notify → commission → hand over, to BS 7671:2018+A4:2026
The survey walk-round: 7 numbered stops, one photo each for the design file
The survey walk-round: 7 numbered stops, one photo each for the design file
PAS 63100: outdoors where practicable; indoors needs REI 30 separation and fire-stopped penetrations.
PAS 63100: outdoors where practicable; indoors needs REI 30 separation and fire-stopped penetrations.
Supply, meter, consumer unit, AC isolator, inverter, DC isolator, battery: one line, drawn first.
Supply, meter, consumer unit, AC isolator, inverter, DC isolator, battery: one line, drawn first.
AC off, DC still live: isolation covers battery DC, inverter AC and any PV input.
AC off, DC still live: isolation covers battery DC, inverter AC and any PV input.
G98 up to 16 A per phase in total (≈3.68 kW at 230 V); above that, G99 before installing.
G98 up to 16 A per phase in total (≈3.68 kW at 230 V); above that, G99 before installing.
Visual → dead tests → DC checks → AC on + live tests → DC on → setup → functional → record.
Visual → dead tests → DC checks → AC on + live tests → DC on → setup → functional → record.
Circuit, dead and live tests, inverter, functional tests, labels and notification on one sheet.
Circuit, dead and live tests, inverter, functional tests, labels and notification on one sheet.

Swipe to see more →

These are real pages from the book. The table of contents is the full one: 8 parts and 60 topics.

The Problem Isn't You. It's How It Was Explained to You.

You're standing in a customer's hallway. They want the battery under the stairs, or up in the loft, and they're waiting for your answer.

You've read about siting. But the guidance gives it to you in long paragraphs, the manufacturer's manual says something else and the forums say a third thing. On site, none of it comes back in the right order.

PAS 63100: outdoors where practicable; indoors needs REI 30 separation and fire-stopped penetrations.

In this book, where the unit can go is one page: the house drawn in section, outdoors where practicable, and indoors only with REI 30 separation and fire-stopped penetrations, with the places to avoid marked on the drawing.

Every other part of the job works the same way. The attached garage, the single-line diagram, DC isolation, G98 or G99, the commissioning order: each one on its own page.

You look at the page, you understand why, and you give the customer a straight answer without going back to the manual.

COMPARE FOR YOURSELF

The Same Topic, Two Ways to Study It

THIS
  • The manual: line after line
  • Survey checks explained only in words
  • You turn up on site with doubts
Prior to the preparation of any quotation for an electrical energy storage system, the installer should undertake a comprehensive survey of the premises, giving due consideration to the characteristics of the supply, the type of earthing arrangement, the rating of the main fuse, the condition and suitability of the existing installation, the proposed location of the equipment with regard to fire risk and means of escape, the routes available for cabling, and the presence of any existing generation, all of which should be recorded within the design documentation.
FOR THIS
  • The survey walk-round in one drawing
  • The 7 stops in a numbered box
  • You see it and you get it
The survey walk-round: 7 numbered stops, one photo each for the design file
CONTENTS

Take a Look at the 8 Parts and 60 Topics

How a home battery works, survey and sizing, siting and fire safety, protection and earthing, isolation and labelling, notification, commissioning and handover, and revision checklists: 64 pages, all illustrated.

IHow a home battery system works · pp. 5-11
  1. The install sequence: eight steps, always in this order
  2. What's inside the box: cells, BMS, inverter
  3. AC-coupled vs DC-coupled, side by side
  4. Kilowatts vs kilowatt-hours
  5. Nominal vs usable capacity
  6. Battery chemistries you'll meet: LFP, NMC, lead-acid
  7. Low-voltage vs high-voltage battery stacks
IISurvey and sizing · pp. 12-19
  1. The site survey: what to look at before you quote
  2. Reading the supply: earthing system and main fuse
  3. Is the existing installation fit to connect to?
  4. The customer's daily use in kWh
  5. Sizing for solar surplus
  6. Sizing for time-of-use tariffs
  7. Inverter power: will it run the kettle and the oven at once?
  8. Backup, whole-house or no backup
IIISiting and fire safety · pp. 20-27
  1. Where the unit can go: the location decision
  2. Where it shouldn't go: escape routes, bedrooms, lofts
  3. The attached garage: what to avoid
  4. Heat detection in the battery room
  5. Wall, floor and fixing
  6. Clearances, temperature and ventilation
  7. Outdoor installs: IP rating, sun and flooding
  8. Access for the fire service and for you
IVProtection, cabling and earthing · pp. 28-36
  1. The single-line diagram of a battery install
  2. The dedicated AC circuit
  3. Bidirectional devices: power flows both ways
  4. RCD type for battery and inverter circuits
  5. DC cable: current, size and voltage drop
  6. DC overcurrent: fuses and breakers on the battery side
  7. Earthing in normal grid-tied mode
  8. Earthing in island (backup) mode
  9. Surge protection and the PV side
VIsolation and labelling · pp. 37-43
  1. Why a battery is never 'off' at the terminals
  2. AC isolation: the steps
  3. DC isolation: the steps, numbered on the unit
  4. Safe isolation when PV is also connected
  5. Locking off and warning notices
  6. Dual-supply labels: where they go
  7. The system schematic on the wall
VINotification and paperwork · pp. 44-49
  1. Telling the network operator: G98 or G99?
  2. G98: notify within 28 days
  3. G99 and export limitation
  4. Building Regulations notification in England and Wales
  5. Certificates: EIC and the battery-specific records
  6. Certification schemes and warranties
VIICommissioning and handover · pp. 50-57
  1. Commissioning sequence: the order on one page
  2. Visual inspection before power
  3. Dead tests on the new circuit
  4. Live tests: earth fault loop and RCD
  5. Inverter setup: grid code, CT clamp and modes
  6. Functional tests: charge, discharge, loss of mains
  7. Handover: what the customer needs to know
  8. The handover pack
VIIIRevision and site checklists · pp. 58-64
  1. The eight steps on one page
  2. Survey checklist
  3. Siting checklist
  4. Isolation card
  5. Most frequent mistakes: before and after
  6. Words you'll hear on the course
  7. Blank test and handover record

One Page, One Topic, All Clear

Think of it this way:

You're back on a call-back. The inverter is switched off and you need to work on the battery side. Is it dead, or does it only look dead?

You open the page on why a battery is never 'off' and the answer is drawn: AC off, DC still live, with the isolation points for the battery DC, the inverter AC and any PV input marked on the unit.

AC off, DC still live: isolation covers battery DC, inverter AC and any PV input.

The same goes for the site survey walk-round, the single-line diagram, G98 or G99, and the commissioning order: each one on its own page, drawn the way you'll see it on the job.

Battery Storage Installation Illustrated is 8 parts and 60 topics, all drawn, and at the end the site checklists, an isolation card and a blank test and handover record.

What you see drawn, you don't have to memorize.

What's Inside Battery Storage Installation Illustrated:

Ipp. 5-11

How a home battery system works

The eight install steps, what's inside the box, AC- and DC-coupled side by side, kW vs kWh and usable capacity: you explain to the customer what they're buying without mixing up power and energy.

IIpp. 12-19

Survey and sizing

The site survey, the supply and earthing system, whether the existing installation is fit to connect to, daily use in kWh, sizing for solar and tariffs, inverter power and backup options.

IIIpp. 20-27

Siting and fire safety

Where the unit can and can't go, the attached garage, heat detection, fixing, clearances and ventilation, outdoor installs and access.

IVpp. 28-36

Protection, cabling and earthing

The single-line diagram, the dedicated AC circuit, bidirectional devices, RCD type, DC cable and overcurrent, earthing on-grid and in island mode, surge protection.

Vpp. 37-43

Isolation and labelling

Why a battery is never 'off', AC and DC isolation step by step, isolating with PV connected, locking off and dual-supply labels: you know which side is still live before you touch it.

VIpp. 44-49

Notification and paperwork

G98 or G99, the 28-day notification, export limitation, Building Regulations notification, certificates and battery records, schemes and warranties.

VIIpp. 50-57

Commissioning and handover

The commissioning order on one page, visual inspection, dead and live tests, inverter setup, functional tests, handover and the handover pack.

VIIIpp. 58-64

Revision and site checklists

The eight steps on one page, survey and siting checklists, the isolation card, the most frequent mistakes, course vocabulary and a blank test record.

At the end of the book: Site checklists, an isolation card and a blank test and handover record.

Plus: 2 Free Books

Battery Storage Practice Questions: Exam-Style, With Answers Explained

BONUS 1: «Battery Storage Practice Questions: Exam-Style, With Answers Explained»

Value on its own: US$ 17.90

Test yourself on sizing, siting, isolation and commissioning with exam-style questions, each answer explained with the page it comes from.

Battery Install Mistakes: Before & After Cards

BONUS 2: «Battery Install Mistakes: Before & After Cards»

Value on its own: US$ 14.90

The most common battery installation mistakes drawn side by side with the right way, so you can spot them on site at a glance.

Battery Storage Installation Illustrated with 2 Free Books

  • Battery Storage Installation Illustrated: 64 illustrated pagesUS$ 63
  • BONUS 1: Battery Storage Practice Questions: Exam-Style, With Answers ExplainedUS$ 17.90
  • BONUS 2: Battery Install Mistakes: Before & After CardsUS$ 14.90
  • High-resolution PDF to printIncluded
Total value US$ 95.80
YOUR PRICE:
US$ 27
You save US$ 68.80
YES, I WANT BATTERY STORAGE INSTALLATION ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.

Secure purchaseEncrypted payment30-day guarantee

PDF by email: We email you Battery Storage Installation Illustrated as a PDF, together with the two free books. It's a single payment: no installments, no extra charges.

Who This Book Is For

You're studying for the battery storage course

You're studying for the battery storage course

Each topic of the course on one page, drawn, so you study at night or in the van and the order stays with you.

Your course date is close

Your course date is close

The eight steps, the isolation card and the commissioning order on single pages to revise the week before, plus the practice questions to test yourself.

You're already fitting batteries

You're already fitting batteries

A print-out to keep in the van: where the unit can go, how to prove the DC side is dead and what to send the network operator.

Everything You Get Today

US$ 95.80US$ 27
YES, I WANT BATTERY STORAGE INSTALLATION ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.

30DAYS
GUARANTEE

30-Day Guarantee

Try Battery Storage Installation Illustrated for 30 days, bonus books included.

We refund everything if the file won't open, if the book isn't what you see here, if you were charged twice or if the email doesn't arrive. Just email us.

You pay once. No subscriptions.

Frequently Asked Questions

Is it for me if I've been an electrician for years and I'm only now adding batteries?

Yes. It doesn't teach you how to wire a consumer unit: it draws what's new with batteries, on top of what you already know, from the survey to the handover.

Where does the content come from?

From BS 7671:2018 with Amendment 3 (2024), which added the chapter on stationary batteries, PAS 63100:2024 on siting and fire, the IET Code of Practice for Electrical Energy Storage Systems, ENA G98, G99 and G100, and MCS MIS 3012. It's UK-only: UK terms, units and notification rules, nothing American. The Building Regulations pages follow England and Wales; in Scotland and Northern Ireland, check your local route. Everything is explained with our own drawings, not copied from the standards.

Is it official material?

No. It's an independent illustrated study book. It isn't published, approved or endorsed by any standards body, network operator, scheme or awarding body, and it doesn't give you a certificate, a qualification or CPD hours: those come from your accredited course.

Does it replace the course or training?

No. It doesn't replace accredited training, the manufacturer's instructions or BS 7671 itself. It helps you understand and revise what you learn there.

Are the practice questions the ones from the exam?

No. They're written for this book, in exam style, and each answer is explained with the page it comes from.

When and how does it arrive?

The book and the 2 free books arrive as PDFs by email, at the address you enter when you pay.

Do I have to pay every month?

No. It's a one-off payment. No subscription.

Can I have it on paper?

Yes. It's a PDF you can print at home or at a print shop, whole or just the pages you want in the van.

How does the refund work?

You have 30 days. We refund everything if the file won't open, if the book isn't what you see on this page, if you were charged twice or if the email doesn't arrive: just email us.

Before You Close This Page

No more rereading the guidance and keeping nothing.

DC isolation: you see it drawn, step by step, and that's it.

You arrive at the course and the job knowing where everything is.

Drawings make studying faster.

The book is right below.

One-time payment: US$ 27 · Guarantee: 30 days · PDF by email

YES, I WANT BATTERY STORAGE INSTALLATION ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.